EPD generators

Get precise, reliable environmental data for every one of your products with Grunda's EPD generators.

Compatible with

Why an EPD generator?

Get product-level EPDs

With our generators, you can cover your entire product range in a matter of months. Each product can get its own single-product EPD or be included in a multi-product EPD.

Generate project-specific EPDs

Generate verified EPDs that are specific to a deal, with the right product configuration, the exact dimensions, the actual transportation metrics and more.

Eco-design your products

With our eco-design module, you can tweak your product's composition, transportation, packaging and more to find the most sustainable option. All simulations follow EN 15804+A2 and the applicable PCRs or national complements to produce EPD-ready estimates.

Get ready for the CPR

The Construction Products Regulation provides for LCAs to be included for all construction products. Grunda helps you collect your data and generate LCAs at scale.

How it works

01

We study your industry

To frame the data collection, we dig into your processes, your supply chain, your products and how they're used. We also visit one of your plants to get a precise picture of how things really work.

02

We collect your data

We help you identify the relevant data points, their sources and everything that can already be reused for the LCA. Based on this, we prefill our data collection templates and help you identify the gaps. We then check the consistency and quality of the data.

03

We create the model

We create the LCA model and generate the relevant variants for each programme operator you want to support (e.g. INIES, EPD Global, EPD International). The whole process is verification-ready.

04

We support you through verification

During verification, our team is on hand to answer the verifiers' questions promptly and take their feedback into account.

05

You can generate your EPDs

Once the generator has been verified, you can generate verified EPDs on your own. You can also use the eco-design module to test new hypotheses more freely.

Why choose Grunda?

Book a demo
  • LCA expertise

    Anthony Eichstetter, our Head of LCA and Science, has 5 years of LCA experience, including 2 years at TotalEnergies.

  • Tech know-how

    Frédéric Trégon, our technical lead, has spent 30 years in tech, including 11 years at CodinGame, a leading French tech company.

  • Budget control

    Our lean, agile organisation lets us offer per-EPD prices that traditional consulting firms cannot match.

Frequently asked questions

Do you build EPD configurators that publish pre-verified EPDs, or generators?

We can build both. Configurators that publish pre-verified EPDs let you publish EPDs without any further verification. Generators let you create EPDs quickly, but the EPDs still need to be verified.

Are your generators public or for internal use?

It's up to you. Some of our clients prefer internal tools to keep control over how their EPDs are shared. Others prefer public generators to give their EPDs maximum visibility.

Can you generate both EPDs and FDES?

Yes, our generators can produce FDES (INIES) or EPDs (EPD Global or EPD International).

How long does it take to build a generator?

Building a generator involves data collection, modelling (on our side), then verification by an accredited third-party verifier. Data collection and modelling usually take 3 to 6 months. Verification depends largely on the verifiers’ availability. In total, a generator project usually takes 6 to 18 months.

Contact us

Book a demo